Adirondack Community College: Eisenhard Hall Queensbury, NY
The 30,000 sq. ft. classroom building was originally constructed in 1960 and had never been through a major renovation. The mechanical and electrical systems were in need of replacement. The original heating and ventilation systems were replaced with a geothermal water source heat pump system to provide improved student comfort and for exceptional energy efficiency. The surface mounted wrap-around fixtures were replaced with direct/indirect fixtures with wall wash fixtures for the white boards. |