| |
First Presbyterian Church
Albany, New York
This multi-phase project involved the replacement of all lighting fixtures and controls as well as the electric service. The first phase replaced all of the sanctuary light fixtures with new custom solid brass chandeliers and wall sconces and track lighting for highlighting and infill. A new multi-channel, four scene preset dimming system was also installed with two (2) additional remote control stations on the Altar for control during services. The second phase included upgrading the electric service, adding an emergency lighting system with remote heads and a central battery unit, and providing new work lights throughout the three attic levels and in the organ pipe chambers. The third and final phase of the project was to provide low voltage MR-16 lamps on a flexible track behind the alter arch to light the arch coffered ceiling and the rear wall around the raradose.
|
|