Philipsburg Manor Chiller
Terrytown, NY
We were retained initially to design the installation of a 40-ton gas-engine driven chiller. We conducted an economic analysis of the system and then performed the detailed design of the selected system. The selected system was for the installation of a new electric-driven chiller. |